Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9 A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z More Details for 2008-03-30
Sunday -- off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Reisman except for housekeeping and voluntary work. Ahead: Week 24 of Increment 16. Flight Control to Crew: 'Everyone at the ATV-CC (as well as MCC-M and MCC-H) could not be more pleased with how Demo Day 1 went!' From his voluntary 'job jar' task list, after wakeup and before breakfast FE-2 Garrett Reisman completed his third session with the SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight) experiment software for data logging and filling in questionnaire entries in the experiment's laptop session file on the HRF-1 laptop. (To monitor the crewmember's sleep/wake patterns and light exposure, Garrett wears a special Actiwatch device which measures the light levels encountered by him as well as his patterns of sleep and activity throughout the Expedition. The log entries are done within 15 minutes of final awakening for seven consecutive days.)
Also before breakfast, having reached the FD15 (Flight Day 15) mark in his flight, Reisman performed the last sampling of his first session with the NASA/JSC experiment NUTRITION w/Repository, collecting a final urine sample upon wakeup for storage in the MELFI (Minus-Eighty Laboratory Freezer for ISS). The sampling kit was then stowed away. (The current NUTRITION project is the most comprehensive in-flight study done by NASA to date of human physiologic changes during long-duration space flight. It includes measures of bone metabolism, oxidative damage, nutritional assessments, and hormonal changes, expanding the previous Clinical Nutritional Assessment profile (MR016L) testing in three ways: Addition of in-flight blood & urine collection (made possible by MELFI), normative markers of nutritional assessment, and a return session plus 30-day (R+30) session to allow evaluation of post-flight nutrition and implications for rehabilitation.) The crew conducted the regular weekly three-hour task of thorough house cleaning. ("Uborka", normally done on Saturdays, includes removal of food waste products, cleaning of compartments with vacuum cleaner, damp cleaning of the Service Module (SM) dining table, other frequently touched surfaces and surfaces where trash is collected, as well as the FE's sleep station with a standard cleaning solution; also, fan screens and grilles are cleaned to avoid temperature rises. Special cleaning is also done every 90 days on the HEPA (high-efficiency particulate air) bacteria filters in the Lab. Additionally, as part of the weekly cleaning, Malenchenko performs an inspection of structural elements, cables and instruments behind SM panels for moisture.) Later, the FE-1 completed the routine maintenance of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM, including ASU toilet facilities systems/replaceables plus the weekly collection of the toilet flush counter (SPK-U) and water supply (SVO) readings for calldown to TsUP/Moscow. (Regular daily SOZh maintenance consists of replacement of the KTO & KBO solid waste containers, replacement of an EDV-SV waste water and EDV-U urine container, replacement of the KOV EDV at the SKV-2 air conditioner for the Elektron-intended water, and processing U.S. condensate water as it becomes available in a filled CWC from the Lab humidifier.) Yuri also gathered weekly data on total operating time & 'On' durations of the Russian POTOK-150MK (150 micron) air filter unit of the SM's SOGS air revitalization subsystem for reporting to TsUP. Whitson & Malenchenko conducted another OBT (Onboard Training) session, Part 2, for ATV1 Approach & Docking Demo Day 2 tomorrow (3/31), reviewing RODF (Russian Operations Data File) material and running a number of scenarios, including malfunctions, on the ATV simulator application, supported by S-band tagup with ground engineers. In preparation for the upcoming Japanese CW/RW (Cell Wall/Resist Wall) experiment, FE-2 Garrett Reisman With the U.S. CDRA (Carbon Dioxide Removal Assembly) deactivated by the ground early this morning (~3:15am-8:15am EDT) and its cooling no longer required, Whitson demated and took down the ITCS LTL (Internal Thermal Control System/Low Temperature Loop) jumper at the CDRA-supporting LAB1D6 rack. (After Peggy's troubleshooting on 3/28, CDRA was operated for a day, but ground engineers could not resolve the elevated Precooler differential pressure (dP) offset between half-cycle 1 & half-cycle 2 operations. The anomalous dP signature has not been explained yet, despite several days of troubleshooting. Ground teams are now discussing further troubleshooting options.) Working off his suggested 'time permitting' task list, Yuri Malenchenko completed a series of regular maintenance tasks for today, by - Conducting his tenth and final Increment 16 run of the Russian DZZ-2 "Diatomeya" ocean observations program (using the NIKON F-5 digital still camera with 80-200 mm lens and the SONY PD-150P camcorder at medium zoom, Yuri focused on color bloom patterns, swirls, wakes of subsurface waves, ocean water level drop, smoothing lanes in wave fields, and sudden cloud pattern anomalies in the Atlantic and Indian oceans); ATV Update (Flight Day 21): After a highly successful Demo Day 1 rendezvous & approach program yesterday, the ATV1 last night was 120 km in front of and 6.5 km below the ISS. Jules Verne continued to phase in front of ISS at a rate of ~60 km per rev until 8:21pm EDT, when it began coming back for Demo Day 2 tomorrow. TV1: 2:36:30am EDT; delta-V: 2.74 m/s No CEO photo targets uplinked for today.
Home - Search - Browse - Alphabetic Index: 0- 1- 2- 3- 4- 5- 6- 7- 8- 9 A- B- C- D- E- F- G- H- I- J- K- L- M- N- O- P- Q- R- S- T- U- V- W- X- Y- Z © 1997-2017 Mark Wade - Contact © / Conditions for Use |